![]() During that time, the lots have gained tremendous value and the York Bridge Roadway and driveways look amazing." - James C. The financial and commercial structure of the project lends itself to a flexible relationship between sponsor, funders, developer, contractor, operator. 0.01 0 1.45 1.40 -3 1.52 5 1.43 -1 1.54 1.37 -11 1.9 18 1.46 -6 0.10 1.55 1.53 -1 1.63 5 1.56 1 1.59 1.43 -10 1.82 14 1.52 -5 0.20 1.66 1.56 -6 1.65. It only took Watershed Eco 12 years to gain the approvals and the developer over 30 years to gain access to these 8 lots. During that time, we also had to convince the State Transportation Department and Environmental Department that this was viable. York Bridge was instrumental in supplying information and specifications in order to assist with the approval process. After about 10 years and lots of data and studies, we were able to convince the Corps that this was truly a piling project and there would not be the same effect as fill. We would need to prove that the method would not have the same effect as fill. When I was hired to look at the Breakwater Beach project, around 2006, I advised the client that we should attempt to build the road and driveway on pilings in order to avoid Corps jurisdiction. In response, the Corps of Engineers issued a Regulatory Guidance Letter that stated, if the pilings have the same effect as fill, they were regulated under Corps rules. At the time, several innovative developers across the country were taking advantage of the Corps policy that they did not regulate the placement of pilings in wetlands, only fill material. They spent many tens of thousands of dollars and never got the permit they needed to build the road. The developer hired consultants who were nationally recognized and had written the wetland regulations in Corps Headquarters and were now in the private sector. There were 8 super valuable lots next to the ocean and the proposed roadway area was considered wetlands. Army Corps of Engineers in 1987, my office mate, Bill Lang had this project. ![]() The finished product hovers just 3 feet above the ground mixing in with the wetland grasses, giving access to future premiere homes with views of both the Atlantic Ocean and Indian River Bay. The YBC construction field team exhibited excellence in the friction set installation of over 700 piles using our vibratory hammer and splicing methods ultimately providing a hearty foundation with a 75 year life span. The Decero Design team formulated a 100% pile supported structure specifically to be built utilizing deck level construction to minimize wetland impacts. The traditional timber picket pedestrian rail with vehicular-rated impact curbing wraps the structure, complementing the local coastal architecture. This vehicular structure boasts more than twenty thousand square feet of driving surface. ![]() YBC was sought out by developers to help access the residential lot acreage that prohibited standard development methods. Tucked into the prestigious Breakwater Beach Community is a unique and massive timber structure that serves as a double lane drive aisle, cul-de-sac, eight double car width private residential driveways, as well as, divided pedestrian walkways. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |